Hardware and instrumentation

The bench, the rack and the thing being measured

We specify, integrate and commission the instrumentation that tells a plant what it is actually doing. We say plainly where our work stops and a sibling division’s begins.

Book a survey See the shapes of work

A survey is a fixed piece of work and ends in a written scope.

A level loop, drawn Drag the level
Level
3.20m0 to 5 m
Loop
14.24mA4 to 20 mA
Register
419420xA3D6

The level sets the loop current, 4 mA empty to 20 mA full, and the rack card reads that current as a sixteen-bit count. A drawing of the signal chain, on a span chosen so the arithmetic is easy to check. No site or measurement stands behind it.

Evidence

What a fit-out involves

These are the shapes our work takes, not performance claims. Every number here is a duration or a count that the offerings page defines.

16 weeks
From survey to a commissioned bench, for the longest shape on our menu.
4 divisions
One firm. Each names the sibling that owns the other half of every seam.
5 stages
Survey, bid, build, commission, handover. Each ends in something you can name.
The offerings menu Five engagements, every bar drawn against the same sixteen weeks. None of them rescales to fit.
  • Instrumentation fit-out Hardware 16weeks
  • Integration build Software 10weeks
  • Estate handover IT 6weeks
  • Passive audit Cyber 2weeks
  • Discovery week Software 1week

The fit-out is the longest shape on the menu and the only one that ends in something you can touch: a bench.

See the shapes of work
The work

What we do

Measurement you can defend

An instrument that nobody can trace to a calibration is a number nobody can use. Every loop we commission leaves with its record.

Protocols, translated

Modbus, OPC UA and MQTT, and whatever is on the other side of them. Where translation becomes an application, that is the software division’s half and we say so.

Racks that somebody else can open

Labelled, documented and built so the next engineer is not us. A bench only we can maintain is a bench we sold you badly.

How it runs

The shape of an engagement

Five stages, always in this order. Choose one to see what it ends in and what we ask of you.

Stage 1 of 5

Survey

A fixed piece of work. We walk the floor, trace what you measure and how, and conclude what to adopt and what to replace. The survey is allowed to say a bench should go.

It ends in
A written scope you can take to anybody
What we ask of you
Access to the floor, and whoever knows what the instruments are for.
Stage 2 of 5

Bid

A fit-out needs a bid, priced from our rate card. We write it down, so you can compare it with anyone else’s.

It ends in
A bid in writing
What we ask of you
A decision, and the scope read by whoever signs for it.
Stage 3 of 5

Build

We specify, integrate and assemble from proven parts. We label racks as we build them, not afterwards.

It ends in
A bench
What we ask of you
A named person to answer questions about the process as it is.
Stage 4 of 5

Commission

We prove every loop from the instrument to the register it feeds, and each sensor’s calibration record goes into the handover.

It ends in
Loops handed over with their records
What we ask of you
Time on the process, so the loops are proved against something real.
Stage 5 of 5

Handover

Design files, programs and configuration records are handed over in formats that open without us, so the next engineer is not us. Who owns what is written into your contract before work starts.

It ends in
Files that open without us
What we ask of you
Somebody to open the rack with us, once, and find nothing surprising.
The boundary

Where this division stops

Four seams, each naming the sibling that owns the other half. Each sibling states the same seam from its own side.

  • Testing a plant network

    Cyber’s half. The firmest seam says why.

  • Computers your staff log into

    Laptops, workstations and the estate around them are IT’s half.

  • Turning a protocol into an application

    We connect the hardware to the systems it reports to. The application that stores and shows what it produces is Software’s half.

  • Calibration records

    Ours. Every unit leaves with its calibration record and a spares list.

The firmest seam

A team should not be the independent assessor of its own build.

From the hardware division’s published scope, on the cybersecurity seam.
Before you call

Questions we get asked first

Do you manufacture?

No. We specify, integrate and program hardware, and choose proven parts wherever they fit. When nothing off the shelf works, we design the part and hand the production package to a contract manufacturer.

Can you take over a bench somebody else built?

That is what a survey is for. It looks at what is there and is allowed to conclude that the bench should be replaced rather than adopted.

How is the work priced?

A fit-out is bid in writing, priced from our rate card, so you can compare it with anyone else’s. A survey ends in a written scope. No number on this page is a quotation.

Who holds the documentation afterwards?

Handover is the design files, programs and configuration records, in formats that open without us. Who owns what is written into your contract before work starts.

The first step

Start with a survey

Tell us what is on the floor now and what it is failing to tell you. A survey is a fixed piece of work and ends in a written scope you can take to anybody.

Book a survey Or call (214) 723-2510

The first button opens an email to info@computingamerica.com. No number on this page is a quotation.

What to bring

  1. What is on the floor now, as far as anyone remembers.
  2. What it is failing to tell you.
  3. Whoever will open the rack next.