Service agreement SA-04417Sent for signature
Gearbox oil-change program
Priya Raghunathan owns this agreement. Editing it, sending it for signature and moving its stage are hers.
Annual contract value
$486,720a year
9 turbines × 2 visits × $27,040 a visit
$1,460,160 over 36 months
Not available to your role The annual value and the margin are Priya Raghunathan's to see.
- Account
- Ridgeline Wind CooperativeKlickitat County, WA
- Term
- Nov 1, 2026 to Oct 31, 2029Renewal notice due Aug 2, 2029
- Turbines covered
- 9 of 14
5 more on the register, not in this quote - Owner
- Priya Raghunathan
Agreement path
Record
Upcoming and overdue as of Sep 11, 2026
-
Sep 8, 2026
Ask Marisol Treviño to extend the finance approval past the board meeting. It expires on Oct 17 and the cooperative's board does not sit until Nov 12.
Marisol wants the board date in writing before she extends anything. Devin has it from the Sep 4 call and nobody has sent it on.
-
Sep 18, 2026
Confirm the outage window with Samuel Okoye. The first visits are planned for Nov 16 and 17.
September 2026
-
Sep 9, 4:12 PM
Priya sent the liability cap redline to the cooperative's counsel and asked for the board's meeting date in the same message.
The cap sits at one year of fees, which matches what your board approved for the Beaverhead site. Tell me the date of the November meeting and I will hold the pricing to it.
-
Sep 4, 9:40 AM
Devin logged a call with the operations manager. The cooperative's board meets on Nov 12, and nothing gets countersigned before then.
Sam cannot sign for crane hire on his own authority. He will put the schedule in front of the board on Nov 12 and expects a decision the same evening.
Devin raised the finance approval expiry on the call. Sam understood that a lapsed approval means the price is re-run rather than re-negotiated.
August 2026
-
Aug 28, 11:02 AM
The agreement moved from Pricing approved to Legal review.
-
Aug 21, 1:48 PM
Marisol added Schedule B for crane hire. The crane is priced apart from the oil, so the board can argue one line without the other.
July 2026
-
Jul 21, 2:25 PM
Finance approved the margin at 22.4%a figure your role cannot see and dated the approval Jul 19, which puts its expiry on Oct 17.
June 2026
-
Jun 3, 5:07 PM
Devin filed the survey report for all nine nacelles. Two gearbox plates carry serial numbers the cooperative's register does not hold.
-
Jun 2, 10:15 AM
Samuel Okoye shared the cooperative's asset register. It lists fourteen turbines; the quote covers nine.
Agreement
- Agreement number
- SA-04417
- Account
- Ridgeline Wind Cooperative
- Service level
- Scheduled, 2 visits a year per turbine
- Turbines covered
- 9 of 14
- Proposed start
- Nov 1, 2026
- Term ends
- Oct 31, 2029
- Renewal notice due
- Aug 2, 2029
- Owner
- Priya Raghunathan
Commercial
- Annual value
- $486,720Not available to your role
- Per visit
- $27,040 across 18 visits a yearNot available to your role
- Over the term
- $1,460,160Not available to your role
- Margin
- 22.4%Not available to your role
- Pricing approval dated
- Jul 19, 2026
- Pricing approval expires
- Oct 17, 2026
- Crane hire
Legal
- Liability cap
- Signed by the cooperative
- Not yet
- Counsel
- Alina Harkness, Harkness & Bell
Contacts (3)
Work orders (2 of 18)
Files (4)
Design notes
Shape of the page
Salesforce's record layout: a highlights panel, a path across the full width, activity and details in one tabbed card, related lists beside it. On a phone the lists become a tab, the actions move to a bar under the thumb, and the path becomes six segments.
What it leads with
One figure and one problem. The agreement is worth $486,720 a year, set larger than anything else on the screen, and the path beneath it shows which stage a date nobody here controls is holding up.
Spacing
Salesforce's defaults for everything a salesperson reads all day: 13px text, a 4px scale, 32px controls. The money and the path get the room, and the form that closes the stage waits quietly beside the problem.
The one bold decision
The path is wide enough to read across the room, and the held stage says why: no approval for 26 days. Under it come the fix, with the overdue task that carries it, and then the cause drawn on a calendar. Change the board date and all of it answers.
Readability, measured
- Send 4.63:1
White on the brand blue. The main action and the current stage, over the floor of 4.5 for text.
- Edge 3.07:1
A control's edge on white. Over the floor of 3 an edge needs. The lighter line, at 1.66:1, only rules between rows.
- Complete 4.65:1
White on the stage green. A finished stage.
- Held 7.66:1
Held stage text. One problem, one colour.
- Waiting 7.73:1
A stage that has not opened. Grey, and it says what it waits on.
Where the colour comes from
Every colour, corner, shadow and timing is Salesforce's own published set, taken from the system rather than sampled by eye.
One theme
Light only. Inside Salesforce the theme belongs to the company running it rather than to any one screen, so this page does not invent a second one.
Money and dates
This record belongs to a Washington cooperative, so money is US dollars and dates run month first. Every relative date on the page counts from Sep 11, 2026.
Hover and press
Every stage can be opened. Each state moves two steps down its own colour ramp under the pointer, so a hover never shows the colour of a different state.
What we added
Salesforce publishes how long its animations run but not how they ease, so the page uses a standard easing over the published timings.