Floor map of the eight nodes
- Running
- Vision
- Fluids
- Genomics
Drag to see the floor up to six hours ahead, with each queued job where the schedule puts it.
Eleven jobs running, nine queued. One of the nine has no node it can run on.
Drag to see the floor up to six hours ahead, with each queued job where the schedule puts it.
Running jobs first, then queued ones in the order they arrived. A start time is a projection that never delays a job ahead of it.
| Job | Name | State | GPUs | Node | In state | Clock | Next 6 h | GPU-hours |
|---|
A queue that treats a job nothing can run as a different thing from a job that is waiting, drawn in a language that spends one green and almost nothing else.